• 1,452,517 SF Hotel; 45-story mixed-use building
  • 7-level below-grade parking (363,819 GSF)
  • 1260 Hotel Rooms, 105,000 SF Ballroom and Meeting Spaces, 6 Kitchens
  • On-site Laundry Facility
  • Street-Level Retail
  • Multiple Restaurants envisioned (including Daniel's Broiler)
  • LEED Gold
  • Full 3D Modeling (BIM)
  • Type B Construction
  • Electrical, Special and Comm Systems
  • Design-Assist with budgeting and design input for constructability, including VE and long lead material coordination
  • Network Infrastructure, Security, WiFi, Audio Visual, Television and Distributed Antenna Systems (DAS)
  • General Contractor: Sellen Construction
  • Architect: LMN Architects

Job Progress: